1
Define the Project Parameters
close × The total number of employees this office scenario must support.
close × The total square footage of the building footprint, including core and shell.
close × Net Usable Area Options: 'Calc 1' estimates usable square footage by applying a standard baseline (80% of Gross). 'Calc 2' applies a denser layout baseline (75% of Gross). 'Manual' allows you to enter exact, verified square footage measurements directly from your architectural plans.
2
Configure the Asset Infrastructure
(i)
Objective: Maximize interactive dwell time and friction-free brainstorming. Swaps fixed desks for adaptive team zones using mobile CampFire desks and Juce mobile monitor stands. Rejects fixed wall outlets, relying on a decentralized, battery-powered desk approach so teams can self-assemble layouts without core-drilling floors.
(i)
Objective: Create a sanctuary for deep, uninterrupted execution. Prioritizes individual acoustic havens and shielded focus workstations to eliminate unmanaged open-plan chaos. Seamlessly integrates onboard battery power directly into desks to sustain multiple devices without tethering layouts to structural columns.
(i)
Objective: Fuel cultural alignment and hospitality-first 'hotelification.' Features comfortable lounge settings, café spaces, and biophilic designs. Replaces heavy conduits and visible wires with hidden mobile power sources to support ambient lighting and digital screens without disrupting the premium aesthetic.
(i)
Objective: Eliminate future vacancy risk via move-in-ready spec suites. Outfits layouts with rapid-response systems like Respond! where mobile, battery-powered furniture handles the work of traditional construction. Achieves a Zero TI model, allowing spaces to pivot instantly for successive tenants without demolition delays.
(i)
Objective: Optimize layouts around human biology, ergonomic movement, and natural light. Standardizes sit-to-stand desks and adjustable monitor setups. Powers active furniture via onboard DC distribution battery systems to eliminate trailing power cord tripping hazards and allow total design freedom.
(i)
Objective: Support high-density compute power and compressed, high-velocity data visualization. Replaces standard desks with heavy-duty workstations built for intensive local edge computing. Feeds high-capacity C-Power directly to desktops via native USB-C power delivery interfaces to bypass rigid floor outlets.
Toggle the global layout modeling parameters between Square Feet (SFT) and Square Meters (SM).
Workstation Mix
Select the ratio of Respond! desks (focus) to CampFire desks (collaborative).
The ratio of the number of employees to the number of workstations. Caution: ratios higher than 1.4 are typically avoided.
Acoustic Calculation Model Rules (PET Baseline Matrix): Estimates the absolute sound absorption treatment area needed by applying shell reflectivity multipliers directly against net space parameters:
Concrete/Glass Core (35%): Handles hard, highly reflective open architectural elements.
Standard Office (15%): Grounded traditional drywall/carpet attenuation baseline loops.
Industrial Loft (50%): Open structural double-height brick/metal open noise mitigation pathways.
Select the standard CampFire product configuration. Standardized to 4-place across all layouts for optimal spatial returns.
Select the standard Juce Charging System product configuration (12-place, 18-place, or 24-place smart battery docking vaults).
Standard: single laptop and one extra monitor. High Performance: single laptop (or computer) and two extra monitors.
The percent of batteries add to a reserve that ensures continuous operation of every workstation.
Define the total number of focus and collaboration pods required per 100 employees.
Select the percentage split between Single Pods (first number) and Multi-Pods (second number) allocated across the workspace layout.
Define the number of Juce Monitor Stands required per 100 employees.
Specify the number of additional Juce PDUs required per 100 employees to support conference rooms, collaborative lounges, or legacy AC devices.
The strategic baseline threshold standard parameters criteria for layout plateau capacity tests.
3
Compare the Scenarios
Strategic Framework Scenario Review Platform
4
Communicate